Monday 30 August 2010

Before and after in Glen Lyon












Recently I had to rebuild this wall in the Glen. The problem was that one side of the wall is much lower than the other with a drain below this point under the road. The old pipe had caved in and as a result the wall had tipped towards the field. During the winter with heavy snow falls the snow plough had forced the pile against the weakened wall and there had been a collapse. I relaced the pipe and rebuilt the wall.
Our branch New menbers day will feature in the next entry on 3rd September.

No comments: